Shanghai water project completed
by ArabianBusiness.com staff writer on Sunday, 21 October 2007
Around 2.6km of the water supply network in Shanghai has been replaced in a project aiming to eradicate leaks and water wastage.
As maintaining the high water flow was a priority, Contractor Shanghai Pudong Water Supply & Drainage Construction Engineering used Swagelining trenchless installation to carry out the project. The technique involves digging small pits through which pipes are inserted into the network. This ensured minimal disturbance in the city while maintaining high pressure water distribution.
Borouge BorSafe HE3490-LS plastics water pipes were used to replace the previous iron pipes in the network. The pipes are manufactured from high impact resistant material that can withstand temperature extremes, high water pressures and stress cracking.
Pipe converter Shanghai Chinaust Plastics recommended the use of the BorSafe products. Sales manager Hou Shubin explained: "BorSafe HE3490-LS provided important materials savings while optimising the thickness that could be used. As a low sag material it allows larger pipes with a constant thickness to be extruded."
READERS' COMMENTS
MORE FROM ARABIANBUSINESS.COM
TOP IN MIDDLE EAST CONSTRUCTION & INDUSTRY
TOP MIDDLE EAST BUSINESS STORIES
ALSO IN MIDDLE EAST CONSTRUCTION & INDUSTRY
LATEST MIDDLE EAST BUSINESS NEWS
- Technology: WebSpy to expand distribution to the Middle East
- Politics & Economics: Pakistan offers help to track down Mumbai terrorists
- Culture & Society: 2.5mn expected to take part in Haj pilgrimage
- Healthcare: Health chiefs back new nursing council plan
- Construction & Industry: MPs raise concerns over Bahrain mega-project
RELATED STORIES
Borouge
- Borouge to develop facility in China
22 Aug '07 | News - Samsung collects Borouge contract
22 Jun '07 | News




