Dubai's Floating Bridge to stay for 5 more years – paper
by This email address is being protected from spam bots, you need Javascript enabled to view it on Friday, 06 November 2009
Dubai’s Floating Bridge that was built as a quick solution to reduce traffic congestion over the Dubai Creek, will stay till 2014, according to a report on Friday.
"We are reviewing the project and the Floating Bridge will not be removed for another five years until at least 2014," a top official at the Dubai Roads and Transport Authority (RTA) told the UAE-based Gulf News daily.
The Floating Bridge connects Riyadh Road, Dubai Courts and Creek Park on the Bur Dubai side with Baniyas Road, Deira City Centre and the Dubai Creek Golf & Yacht Club on the Deira side.
The Floating Bridge has a capacity of 6,000 vehicles an hour, and was opened on 16 July 2007.
According to Gulf News, the bridge was built as a temporary solution to traffic congestion and it was to be replaced by the planned Seventh Crossing called ‘Dubai Smile' by 2012.
The bridge is open daily from 0600 (6 AM) to 2200 (10 PM). During off hours, the bridge is opened to allow boats to pass through.
"The bridge will stay for another five years due to review of the several existing road projects. The construction of the Seventh Crossing has been delayed but it will eventually be built to replace the Floating Bridge," the official told Gulf News.
READERS' COMMENTS
MORE FROM ARABIANBUSINESS.COM
TOP IN MIDDLE EAST TRANSPORTATION
TOP MIDDLE EAST BUSINESS STORIES
ALSO IN MIDDLE EAST TRANSPORTATION
LATEST MIDDLE EAST BUSINESS NEWS
- Retail: Jeweller closures ‘inevitable’ as gold demand slumps
- Politics & Economics: Abu Dhabi eyes major growth in non-oil sector
- Travel & Hospitality: Oman Air increases free baggage allowance
- Construction & Industry: Abu Dhabi firm in talks to build Iraqi homes mega project
- Retail: UAE grocery sales growth slumps in 2009




